Demolition and new urgent care site
An existing commercial building on a busy Easley corridor came down at the end of July 2025, and the same crews built the full site package for the urgent care that replaced it — from demolition to a paved, striped lot.



What we actually did.
- ✓Building demolition and debris haul-off
- ✓Slab and foundation removal
- ✓Site grading and building pad
- ✓Curb and site concrete
- ✓Asphalt paving and striping
| Project type | Commercial demolition and urgent care site |
|---|---|
| Location | Easley, Pickens County, SC |
| Delivery | Demolition plus the full site package |
| Period | Demolition July 2025 · site complete 2026 |
| Site condition | Active commercial corridor, existing building |
Contract values and quantities are available on request for prequalification.
One contractor, demolition to striping.
The old building came down in the last days of July 2025 — the demolition photos are dated the 30th and 31st — and the cleared site went straight to the same crews for the new pad.
No handoff between a demolition contractor and a site contractor. When one company does both, whatever an old building leaves in the ground is found by its own operator before the pad goes in, not discovered later by somebody else.