School and institutional paving.
Bus loops, parking, playcourts and ADA, done inside a summer break. Campus work is a schedule with a hard wall at the far end, and we have finished against it.
What we do on a campus.
- ✓Full-depth asphalt repair and patching
- ✓Mill and overlay of bus loops, drives and parking
- ✓Sealcoating and crack sealing
- ✓Line striping, arrows, crosswalks and fire lanes
- ✓ADA parking, access aisles, ramps and truncated domes
- ✓Playcourt and hard-surface asphalt
- ✓Concrete sidewalk, curb and pad repair
- ✓Drainage corrections and standing-water fixes
| Clients | Public school districts, universities, YMCA and institutional owners |
|---|---|
| Window | Summer break, holiday breaks and weekend phasing |
| One mobilization | Repair, overlay, sealcoat and striping in the same visit |
| Compliance | ADA parking, aisles, ramps and markings |
| Insurance | Certificates naming the district as additional insured, per project |
| Recent | Greenville County campuses, 2025–2026 |
A district is buying a date, not asphalt.
Nobody at a school district wants to hear about tonnage. They want the lot open, striped and safe on the first morning, with the buses able to turn. Everything we schedule on a campus is built backwards from that day.
Summer discipline
We build the schedule backwards from the first day of school and staff it to hit that date.
One closure
Repair, seal and stripe in one mobilization instead of three separate disruptions.
ADA done right
The compliance items are where campus lots fail. We handle them as scope, not as an afterthought.
Campus work.
Loading photos…
What districts ask.
Can you finish inside a summer break?
That is how we schedule this work. Campus paving is a date problem before it is a paving problem — the lot has to carry buses the morning the doors open, and there is no extension.
Can you do repair, sealcoat and striping in one mobilization?
Yes, and that is usually what a district wants: one closure, one crew, one invoice, and a lot that looks new instead of patched.
Do you handle ADA compliance?
Yes — ADA parking counts, access aisles, ramps and truncated domes are part of the scope, and they are where most campus lots fail an audit.
Are you insured and licensed for school work?
Licensed SC GC #122431, Group 5 unlimited, and insured — general liability, auto and workers’ compensation. Certificates naming the district as additional insured are issued per project.